Guangdong, China
Business Type:
Manufacturer/Factory & Trading Company
Business Range:
Industrial Equipment & Components, Manufacturing & Processing Machinery
Main Products:
Management System Certification:
ISO 9001
Main Markets:
North America, South America, Europe
OEM/ODM Availability:
OEM/ODM Service
Sample Available

Gear, Small Straight Bevel Gear, Straight Bevel Gear manufacturer / supplier in China, offering Small Straight Bevel Gear, Straight Bevel Gear, Bevel Gear, High Precision Customized Transmission Gear Pinion Gear for Robots, Transmission Gear Spur Gear for Textile Machinery with Good Price and so on.

Gold Member Since 2016
Audited Supplier
Supplier Homepage Products Bevel Gear Small Straight Bevel Gear, Straight Bevel Gear, Bevel Gear

Small Straight Bevel Gear, Straight Bevel Gear, Bevel Gear

Get Latest Price
Min. Order / Reference FOB Price
100 Pieces US $1-40/ Piece
Port: Guangzhou, China
Production Capacity: 50000/Month
Payment Terms: L/C, T/T, Paypal
Hardness: Hardened Tooth Surface
Gear Position: External Gear
Manufacturing Method: Cast Gear
Toothed Portion Shape: Double Helical Gear
Material: Carbon Steel
Type: Welding Flange

You Might Also Like


Basic Info

Model NO.: Customized
Colour: Customized
Surface Treatment: Customized
Reporting: Customized
Capability: Over 17 Years History and Selling Oversea
Standard: JIS, ANSI, DIN
Structure: Flanges
Connection: Flanged
Sealing Surface: RF
Manufacturing Way: Casting
Trademark: OEM
Transport Package: Plywood Pallet, Wooden Pallet, Wooden Case etc.
Specification: Customized
Origin: Guangdong, China
HS Code: 84834090

Product Description

Small Straight Bevel Gear, Straight Bevel Gear, bow thruster bevel gear

Product Description
Customized Steel Flange 

1. Description
Type Flange
Material 45#,C8620,SUS304,20CrMnTi etc.
TreatmentHeat treatments, Carburizing, Polishing
Standard      ISO 6
Delivery Date15-20 days for samples(1-20pcs), 25-30 days for production(100-500pcs)

2. Our Product Range:
MATERIALCarbon SteelSAE1020, SAE1045, Cr12, 40Cr, Y15Pb, 1214L.
Alloy Steel20CrMnTi, 16MnCr5, 20CrMnMo, 41CrMo, 17CrNiMo5...
Brass/Bronze   HPb59-1, H70, CuZn39Pb2, CuZn40Pb2,C38000, CuZn40
MACHINING PROCESSGear Hobbing, Gear Milling,  Gear Shaping,  Gear Broaching,  Gear Shaving, Gear Grinding and Gear Lapping
HEAT TREATMENTQuenching & Tempering, Carburizing & Quenching, High-frequency Hardening, Carbonitriding...
SURFACE TREATMENTBlacking, Polishing, Anodization, Chrome plating, Zinc plating, Nickel plating...
3. Scope of Supply

a) Dimension report 
b) Profile report 
c) Chemical treatment report 
d) Material certificate 

4.Delivery Time:
Samples quantity1-10pcs
Samples delivery date15-20 days
Mass Orders:
100pcs -500pcs15-20 days
500pcs-1000pcs30 days
5Kpcs45 days
Inner packingBlister box
Outer PackingStandard cartons

5. Our Services

a) OEM: According to your drawings and samples requirements.
b) Small order is accepted.
c) High precision.
d) Comprehensive and efficient after-sale service

6.Comany information 
ContactCoco XU
Tel0086-757- 85685041
Fax0086-757- 85685979

7. FAQ

Q1. Are you the manufacturer or trading company?
AWe are a professional manufacturer of gear transmission, committing to provide customers with quality, flexible, professional custom services.
Q2. What is your main market?
AOur main market Europe (Italy, Germany, and France), Canada, USA, etc.
Q3. How to get a quotation?
APlease send us drawings in igs, dwg, step etc. together with detailed PDF.
If you have any requirements, please note, and we could provide professional advice for your reference.
Q4. What if we do not have drawing?
ASamples would be available, and we would send you drawing to confirm.
Of course, we would ensure the safety of the drawing.
Q5. How to pay?
AFor most of the order, T/T is preferred.
Q6. How to ship?
AFor small quantity, we have cooperation with TNT, FEDEX, UPS, and DHL etc.
For big quantity, air or sea would be available for you to choose.
Q7. What about the packing details?
AWe attached our normal packing details.
If you have any special requirements, we would be willing to help.
Q8. What about the delivery time?
AIt would be 30-45 days normally for the parts to be ready and we had a system to ensure the time.
When you made your order, you would know.
Any Interest, Please Contact Vivien. Tel: +0086-13424620041 

Send your message to this supplier

avatar Miss Vivien

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now